Mineral Resources Onslow Iron project included development of a dedicated gas pipeline to supply the mine’s power station, with the goal of producing cleaner more efficient power.
Sero Global was involved with construction of the required switch board and control equipment room for the project. With time constraints to meet the project completion schedule, we were able to expedite the design process by utilising our pre-engineered Enercomm modular switch rooms. Scope include full fitout of switch boards and specialty control equipment, storage cupboards and workstations.